Showing posts with label chimneys. Show all posts
Showing posts with label chimneys. Show all posts

Saturday, January 8, 2011

"Plans are only good intentions...

...unless they immediately degenerate into hard work."  ~Peter F. Drucker

2010 was quite a year here at the Einsel House. Here's a selection of scenes around the house from the beginning of 2010:






By December things looked a bit different:






And if we can accomplish half of the projects I have planned for 2011 then things should look different still by next December.

So, what’s in store for 2011 you ask?

The Shed
This poor little building is long overdue for a little love. The picture at left was taken in October of 2009, but it basically looks the same now.  Our plans for this spring/summer are to tear off and replace the rotten awning, recoat the metal roof, wrap the entire building in tar paper and then cover it with salvaged barn siding.

The Stone Bridge
This is perhaps the most intimidating project on the horizon, but given the rate the bridge is eroding I know we should not put this off. The plan is to rebuild the bridge in 4 sections, starting with the northern half of the west side. I suspect this may be a four year project.

The Springhouse
Although the springhouse was the focus of much attention in 2010, the work on this little building is not yet finished. I want to replace the windows and finish work on the roof, as well as plant some ivy or other ground cover around the new stone walls in front of the springhouse.

More Masonry Work
We’re saving our pennies so that we can have our masonry contractor return this spring to repoint the east side (back) of the house. The previous owner of the EH repointed the north side of the house, and our mason did the west side in the fall of 2009 and the south side in June, 2010. Once the east wall is repointed this spring/summer we will save up and hopefully be able to have the chimneys rebuilt sometime in 2012.

The Kitchen
I'm quite excited about my plans for this room and predict I’ll dive into this project sometime before January ends. More details should be coming in a post soon.
The Yard
The yard here is currently a blank if somewhat bumpy slate. My (perhaps overly ambitious) plans for this summer include clearing a small area along the creek for a stone bench that Charles’ parents gave to us last year and planting a vegetable/herb garden in front of the kitchen wing and surrounding it with a picket fence. And of course more general leveling and stump clearing.

So here’s to twenty-eleven. Do I think all of the projects outlined above will be completed a year from now? Probably not. But we’ll have fun trying!

Saturday, October 17, 2009

Look Ma! No Chimneys!


Our masonry contractor has been busy at the house. First up was the lintel over our walk-out cellar stairs. In the before picture below the lintel is mostly hidden, but if it was visible you would have seen that it was wood and it was basically splitting in two lengthwise. The before picture clearly shows the effects this was having on the stone wall above the lintel.



Below is a picture of the new lintel. It is limestone (like the rest of the house) rather than wood. Even without the pointing around it complete it looks soooooo much better!




Next up is an interior threshhold. This is between what will be our dining room and a walk-in closet/laundry room on the first floor. The threshhold is stone, but it had split in two and one part was basically falling into the basement. This was because years ago the stone wall directly under this doorway had a hole cut into it for ductwork. This doorway seemed to shift noticably just in the time we have been in the house, so we are very relieved to have this issue resolved.



And there's the chimneys. We were at the house this morning getting a quote for insulating the attic. I was standing in the living room talking with the insulation contractor when we started to hear rather loud knocks and bangs. After a little bit, the insulation guy said, "Sounds like they're trying to knock the house down for you!" So I went up to a window and looked out, just in time to see two bricks fall from the sky. "Well," I said, "I hope that's only the chimney coming down out there." Luckily, that's all it was. The mason will rebuild these chimneys for us next summer, but because there are other repointing jobs that are more pressing, for the winter they will just be capped off just above the roofline.


To the left is one of the chimneys just before it was taken down. They literally took the things apart by hand. Both chimneys were down within five mintues. So far, we are quite impressed with this masonry company. When we left they were busy (in the 34 degree weather) starting to grind out joints on the east wall of the house. The weather early next week will be back up around 60 degrees and they want to have all the prep work ready so they can start repointing as soon as the thermometer is cooperative.
I've got to say - in the midst of the ever growing "to do" list, it feels very good to see some progress being made!